Impact assessments and environmental and social studies - Sogreah

Impact assessments and environmental and social studies

Impact assessments and environmental and social studies

Impact assessments were introduced in the 1970s and have substantially increased our knowledge of risks and our ability to limit the impact of development works on the environment and human activities. They have been made compulsory in many countries and their scope has gradually been expanded to include new sustainable development objectives. We have performed thousands of environmental impact assessments since the 1960s and we are now extending our activity to include biodiversity conservation, public consultation and mitigating measures. Sogreah is a leader in making environmental protection a reality and is also involved in drawing up environmental action plans. Lastly, we assist our clients in the stakeholder consultation process that is a vital part of regional development projects.

Salins-de-Giraud - Sylveréal - Rhône river embankments
Assessment and design
Salins-de-Giraud - Sylveréal - Rhône river embankments

Country:

France

Customers:

SYMADREM

Date:

2009 - 2010

Services provided

  • Interpretation of geothechnical survey results
  • Stability calcultations
  • Design
  • Regulatory studies
  • Study of the stakes involved
  • Hazard assessment
Environmental Studies for Kambaratinskaya Hydropower Scheme
Environmental Studies for Kambaratinskaya Hydropower Scheme

Country:

Kyrgyzstan

Customers:

EDF

Date:

2008 - 2009

Description

  • The hydropower scheme includes a cascade of two developments:
    - Kambarata I, comprising a 275 m high dam equipped with a tunnel-type spillway and an 1 860 MW power house
    - Kambarata II, comprising a 60 m high dam, a spillway with a capacity of 2 110 m3/s and a 360 MW power house, together with all the ancillary structures. Kambarata II dam is to be built by blasting the mountain (800 tons nitrate fuel as explosive)

Service provided

  • Full ESIA for both projects
  • Environmental Management Plan
Aixe-en-Othe - Wastewater treatment plant discharges
Impact assessment
Aixe-en-Othe - Wastewater treatment plant discharges

Country:

France

Customers:

Commune d'Aixe-en-Othe

Date:

2007 - 2009

» Read more

Services provided

  • Baseline assessment, analysis of indutrial sites
  • Impact of the plant on the natural aquatic environment
  • Measurements on the natural environment, dye tracing in the receiving water body
  • Mitigating measures 
Nam Theun 2 - Hydropower project (1 080 MW)
Technical assistance and environmental audit
Nam Theun 2 - Hydropower project (1 080 MW)

Country:

Laos

Customers:

Electricité de France / Centre d'Ingénierie Hydraulique (CIH)

Date:

2004 - 2009

» Read more

Services provided

  • Environmental technical assistance
  • Environmental audits
Assessment of the impact of climate changes on water resources
Assessment of the impact of climate changes on water resources

Country:

Algeria

Customers:

Agence Nationale des Ressources Hydrauliques (ANRH)

Date:

2006 - 2008

» Read more

Services provided

  • Study aimed to determine the impact of climate changes of the water resources in order to provide the Ministry with the means to manage them better for the purposes of sustainable development
Nachtigal hydropower plant and associated transmission line
280 MW
Nachtigal hydropower plant and associated transmission line

Country:

Cameroon

Customers:

Alucam

Date:

2006

» Read more

Services provided

  • Technical feasibility study
    - General design
    - Hydrology
    - Hydraulics
    - Civil engineering

^ Haut

Marc Giroussens

Marc Giroussens

Water, Energy, Environment Branch Manager