International environmental and social impact assessments (ESIA) - Sogreah

International environmental and social impact assessments (ESIA)

International environmental and social impact assessments (ESIA)

Sogreah helps governments, developers and industrial firms in over 100 countries to conduct impact assessments, providing precise information on the environmental and social consequences of planned activities and taking suitable measures to promote sustainable development. We participate in projects of widely varying scopes and types, including major energy and port infrastructure, industrial extraction or production facilities and development programmes. We handle all environmental procedures, including carrying out initial consultations, field investigations and impact assessments, preparing and implementing environmental and social plans, obtaining environmental permits from national authorities, and validating projects with funding bodies.

Major Hydropower Project in Madagascar (300MW)
Prefeasibility Study
Major Hydropower Project in Madagascar (300MW)

Country:

Madagascar

Customers:

Banque Mondiale / Ministère de l'Energie

Date:

2009

Services provided

  • Initial Environmental Examination of six potential hydropower projects located within the Antananarivo interconnected power grid area
  • Contribution to the multicriteria analysis during the selection process of the most appropriate project
  • Impact analysis focused on risks relating to :
    - dislocation or involuntary resettlement of people
    - loss of precious ecological values
    - deterioration of water quality in reservoir
    - conflicts on water supply rights
    - loss of migratory fish species
    - sedimentation of reservoir and loss of storage capacity
    - decrease in floodplain agriculture
Qinghai Rural Water Resources Management Project
Qinghai Rural Water Resources Management Project

Country:

China

Customers:

Banque asiatique de développement

Date:

2009

Description

  • Project Preparation (PPTA) focusing on poverty alleviation through rehabilitation and improvement of irrigation systems in 3 countries and strengthening of institutions

Services provided

  • Full consolidated ESIA
  • EMP in compliance with standard ISO 14001
  • Resettlement Action Plan in compliance with the ADB requirements
  • Evaluation of the potential impact of climate change
Environmental Studies for Kambaratinskaya Hydropower Scheme
Environmental Studies for Kambaratinskaya Hydropower Scheme

Country:

Kyrgyzstan

Customers:

EDF

Date:

2008 - 2009

Description

  • The hydropower scheme includes a cascade of two developments:
    - Kambarata I, comprising a 275 m high dam equipped with a tunnel-type spillway and an 1 860 MW power house
    - Kambarata II, comprising a 60 m high dam, a spillway with a capacity of 2 110 m3/s and a 360 MW power house, together with all the ancillary structures. Kambarata II dam is to be built by blasting the mountain (800 tons nitrate fuel as explosive)

Service provided

  • Full ESIA for both projects
  • Environmental Management Plan
Shanghai Sanitation Project - APL3
Shanghai Sanitation Project - APL3

Country:

China

Customers:

Banque Mondiale / Gouvernement Français

Date:

2008 - 2009

Services provided

  • Supervision and adjustment of ESIA studies in compliance with the World Bank Guidelines
  • Detailed Environmental Management Plan for the construction period (Standard ISO 14001 compliant)
New Water Intake of the Bas Mangoky Irrigation Scheme
Environmental Impact Assessment Study
New Water Intake of the Bas Mangoky Irrigation Scheme

Country:

Madagascar

Customers:

Banque Africaine de Développement / Ministère de l'Agriculture - Direction du génie rural

Date:

2008 - 2009

Description

  • Construction of a new water intake in Bevoay (20-40 m3/s) for the irrigated rice perimeter of Bas Mangoky (6 000 ha)

Service provided

  • Environmental and Social Impact Assessment
  • Analysis of the downstream hydraulic impacts, fisheries and other water uses; interference with irrigation during construction works, expropriation of houses within the project area, sand deposit management
  • Two complementary analysis were conducted:
    - Environmental audit
    - Proposal of intervention in the catchment basin
Environmental Impact Assessment for a Gas Thermal Plant
1 200 MW
Environmental  Impact Assessment for a Gas Thermal Plant

Country:

Algeria

Customers:

IBERDROLA

Date:

2008

» Read more

Services provided

  • Environmental Impact Assessment
  • Dispersion of atmospheric discharges and Health Risk Assessment
  • Noise modelling
  • Environmental Management and Monitoring Plan
  • Waste Management Plan
  • Restoration Plan
Madagascar - Offshore exploration drilling project
Environmental and Social Impact Assessment
Madagascar - Offshore exploration drilling project

Country:

Madagascar

Customers:

ExxonMobil

Date:

2008

» Read more

Services provided

  • Environmental and Social Impact Assessment
Bemolanga Oil Sandstone Field Exploration Program
Environmental Impact Assessment Study
Bemolanga Oil Sandstone Field Exploration Program

Country:

Madagascar

Customers:

Madagascar Oil

Date:

2008

Description

  • Bemolanga area is the largest ultra-heavy oil field in Madagascar. Among its first activities on the Bemonlanga 3102 concession, Madagascar Oil envisaged carrying out a core drilling programme in 2009

Services provided

  • Full Environmental Impact Assessment following the IFC environmental safeguard policies:
    - drilling waste management
    - water resources depletion
    - erosion control
    - relation with local population
    - site rehabilitation
Cabo Delgado Rural Electrification Project
Environmental and Social Impact Assessment
Cabo Delgado Rural Electrification Project

Country:

Mozambique

Customers:

Electricity of Mozambique

Date:

2008

Description

  • a 132 km transmission line 110 kV along the Coastal Zone of Mozambique, crossing a National Park and including the implementation of a submersible cable (20 km) connecting 3 islands surrounded by large coral reefs

Services provided

  • Environmental and Social Impact Assessment
  • Environmental Management Plan
Electricity IV Transmission Line Project
Environmental and Social Impact Assessment
Electricity IV Transmission Line Project

Country:

Mozambique

Customers:

Electricity of Mozambique

Date:

2008

Description

  • a 150 km TL 110 kV and distribution 33 kV in Mozambique

Services provided

  • Environmental and Social Impact Assessment
  • Environmental Management Plan
  • including land acquisition, expropriation and resettlement issues
Mayumba Deep Harbour Project
Environmental impact assessment
Mayumba Deep Harbour Project

Country:

Gabon

Customers:

Banque Africaine de Développement / Autorité portuaire du Gabon

Date:

2007 - 2008

Description

  • New harbour facility to be developed in the far south of Gabon, close to its border with Nigeria
Services provided
  • Within the framework of the Master Plan and Feasibility studies, environmental assignment included:
    - Environmental evaluation of development scenarios
    - Scoping report
    - ESIA in compliance with IFC Environmental Safeguards
    - Environmental Management Plan for construction and operation stages
Toamasina Port Dredging Program
Environmental impact assessment
Toamasina Port Dredging Program

Country:

Madagascar

Customers:

Autorité Portuaire de Toamasina (SPAT)

Date:

2007 - 2008

Description

  • The Toamasina Port Authorities plan to improve the marine access to Madagascar main port for large vessels in carrying out a major dredging program

Services provided

  • Full Environmental Impact Assessment following the World Bank Environnemental safeguard policies
  • Key issues include marine biodiversity conservation, water pollution prevention and dredging disposal and reuse 
Environmental impact study for a residential development project
Environmental  impact study  for a residential development project

Country:

Morocco

Customers:

Investisseur privé (Dubai)

Date:

2006 - 2007

Description

  • The Client plans to develop a 100 ha residential area featuring marinas, hotels, apartments, leisure facilities, retail, offices and a convention center. The area is located within the city of Rabat on the Bouregreg river.

Services provided

  • Full environmental impact assessment according to IFC guidelines and Moroccan legislation
  • Preparation of environmental management plan (Key issues are the hydraulic and water quality impacts on the river)
Nachtigal Hydroelectric Project
Environmental and Social Impact Assessment
Nachtigal Hydroelectric Project

Country:

Cameroon

Customers:

Alucam (Alcan + Gouvernement du Cameroun)

Date:

2006 - 2007

Description

  • Alcan has recently formed the consortium "Alucam" with the Government of Cameroon. The consortium owns an aluminium production plant at EDEA and envisages to double its capacity. To secure the required supply of electrical power, they plan to build a 306 MW hydropower plant on the Sanaga river and a 225 kV power transmission line

Services provided

  • Full ESIA
  • Environmental Management Plan
  • Compensation Plan for project-affected persons, organization of Public Consultations
in consortium with Tecsult (Canada)
Road Map for ESHIA studies for KCTS project
Kazakhstan Caspian Transport System
Road Map for ESHIA studies for KCTS project

Country:

Kazakhstan - Azerbaïdjan

Customers:

Total

Date:

2004 - 2007

» Read more

Services provided

  • Road Map for Environmental, Social and Health Impact Assessment (ESHIA)
  • Environmental management plan
  • Audi of Waste treatment facilities in Kasakhstan
Darnah - Seismic Survey For Oil Exploration
Environmental and Social Impact Assessment
Darnah - Seismic Survey For Oil Exploration

Country:

Libya

Customers:

Total E&P Lybie

Date:

2006

» Read more

Services provided

  • Environnemental and Social Baseline Survey
  • Environnemental and Social Impact Assessment
Angola - Block 32 Seismic Survey
Environmental Impact Assessment
Angola  - Block 32 Seismic Survey

Country:

Angola

Customers:

Total E&P Angola

Date:

2006

» Read more

Services provided

  • Environnemental and Social Baseline Survey
  • Environnemental and Social Impact Assessment
Sbaa, Algeria - Acquisition Seismic survey - Environmental Impact Assessment
Sbaa, Algeria - Acquisition Seismic survey - Environmental Impact Assessment

Country:

Algeria

Customers:

Gaz de France Exploration Production

Date:

2005 - 2006

» Read more

Services provided

  • Environmental Baseline Study
  • Socio-Economical Study
  • Assistance to the preparation of a seismic survey
Hanoi - Study of an integrated and sustainable transportation programme for Greater Hanoi
Hanoi - Study of an integrated  and sustainable transportation programme for Greater Hanoi

Country:

Vietnam

Customers:

Fonds Français pour l'Environnement Mondial et Département de la Gestion et du Développement des Transports de la Ville de Hanoï

Date:

2004 - 2005

» Read more

Services provided

  • Environmental impact assessment of the transportation programme, in particular in terms of air pollution and petrol consumption 
Mostaganem-Arzew-Oran (MAO) - Drinking water supply project
Environmental impact assessment
Mostaganem-Arzew-Oran (MAO) - Drinking water supply project

Country:

Algeria

Customers:

Agence Nationale des Barrages (Alger)

Date:

2003 - 2004

» Read more

Services provided

  • Geology, hydrogéology
  • Socio-economics
  • Agronomy, pedology
  • Health
  • Environment